Featured Projects

USA Springs

PROJECT DESCRIPTION

This 176,000 square foot water bottling facility is under construction on an 80 acre site in Nottingham, NH. Access to the facility is provided by a 24 foot wide roadway off of Route 4. The roadway is approximately 1500 feet long and leads to a parking area for employees and a loading and storage area. Three production wells provide water for bottling. The project required significant state and local environmental, traffic, and site plan review permitting as well as on-going construction inspection for erosion control and state highway improvements.

Shown below is one of the extensive areas of stormwater management with the building structure in the background.

The plant will have a capacity of 1800 bottles per minute once in operation.